Shown here are several photos taken from the time the boxes arrived through the construction of the tail kit components.
This is a photo of one leg of the H support I used during the construction of the empannage components. The base has 4 lag bolts with large washers and nuts. I use the lag bolts and nuts to "press" the top of the leg against the floor joists above.
This is a photo of one leg of the H support I used during the construction of the empannage components. The base has 4 lag bolts with large washers and nuts. I use the lag bolts and nuts to "press" the top of the leg against the floor joists above.