Service Bay 45 - placing wood blocks on either side so that the foam doesn't dam up water from any leaks, Sandy fills the openings with spray polyurethane foam.
Red Bay, AL - 5 February 2013
Service Bay 45 - the fresh water is slid back in; waiting for Sandy to re-connect the overflow piumbing and lower the black and grey tanks back in place.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor from the wet bay side.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor goes in.
Red Bay, AL - 5 February 2013
Service Bay 45 - all the gunky stuff that was one the wet bay floor.
Red Bay, AL - 5 February 2013
Service Bay 45 - Mui's happy to see the rotted floor gone.
Red Bay, AL - 5 February 2013
Service Bay 45 - between them, Sandy (bottom) and Curtis make quick work of getting the rotted floor out.
Red Bay, AL - 5 February 2013
Service Bay 45 - ... and Curtis has the tub out as well.
Red Bay, AL - 5 February 2013
Service Bay 45 - Before long, the fresh water tank is out and draining ...
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor from the wet bay side.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor from the wet bay side.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor from the wet bay side.
Red Bay, AL - 5 February 2013
See photo in original gallery.