Service Bay 45 - Sandy gets to work on removing the plywood flooring; note the grey metal strips used to strap up the black and grey water tanks to the frame.
Red Bay, AL - 5 February 2013
At Tacky Jack's with Jason & Elizabeth - Feb 6, 2013
Service Bay 45 - a look at the sagging wet bay floor.
Red Bay, AL - 5 February 2013
Service Bay 45 - placing wood blocks on either side so that the foam doesn't dam up water from any leaks, Sandy fills the openings with spray polyurethane foam.
Red Bay, AL - 5 February 2013
Service Bay 45 - the fresh water is slid back in; waiting for Sandy to re-connect the overflow piumbing and lower the black and grey tanks back in place.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor from the wet bay side.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor goes in.
Red Bay, AL - 5 February 2013
Service Bay 45 - all the gunky stuff that was one the wet bay floor.
Red Bay, AL - 5 February 2013
Service Bay 45 - Mui's happy to see the rotted floor gone.
Red Bay, AL - 5 February 2013
Service Bay 45 - the fresh water is slid back in; waiting for Sandy to re-connect the overflow piumbing and lower the black and grey tanks back in place.
Red Bay, AL - 5 February 2013
Service Bay 45 - the fresh water is slid back in; waiting for Sandy to re-connect the overflow piumbing and lower the black and grey tanks back in place.
Red Bay, AL - 5 February 2013
Service Bay 45 - the fresh water is slid back in; waiting for Sandy to re-connect the overflow piumbing and lower the black and grey tanks back in place.
Red Bay, AL - 5 February 2013
See photo in original gallery.