Tile Work - crack in the corian trim at the top of the entry steps.
Red Bay, AL - 6 Feb 2013
Service Bay 40 - with the jacks installed, Mui writes himself a reminder note … we've been without jacks for so long that this is a good safety precaution.
Red Bay, AL - 5 Feb 2013
Service Bay 45 - Sandy gets to work on removing the plywood flooring; note the grey metal strips used to strap up the black and grey water tanks to the frame.
Red Bay, AL - 5 February 2013
At Tacky Jack's with Jason & Elizabeth - Feb 6, 2013
Service Bay 45 - a look at the sagging wet bay floor.
Red Bay, AL - 5 February 2013
Service Bay 45 - placing wood blocks on either side so that the foam doesn't dam up water from any leaks, Sandy fills the openings with spray polyurethane foam.
Red Bay, AL - 5 February 2013
Service Bay 45 - the fresh water is slid back in; waiting for Sandy to re-connect the overflow piumbing and lower the black and grey tanks back in place.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor from the wet bay side.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor goes in.
Red Bay, AL - 5 February 2013
Service Bay 45 - placing wood blocks on either side so that the foam doesn't dam up water from any leaks, Sandy fills the openings with spray polyurethane foam.
Red Bay, AL - 5 February 2013
Service Bay 45 - placing wood blocks on either side so that the foam doesn't dam up water from any leaks, Sandy fills the openings with spray polyurethane foam.
Red Bay, AL - 5 February 2013
Service Bay 45 - placing wood blocks on either side so that the foam doesn't dam up water from any leaks, Sandy fills the openings with spray polyurethane foam.
Red Bay, AL - 5 February 2013
See photo in original gallery.