Service Bay 45 - the new composite floor for the wet bay replaces the old plywood floor that was rotting out.
Red Bay, AL - 5 February 2013
Service Bay 45 - our first ever glimpse of the tanks … fresh water on the bottom; black tank on the left; grey tank on the right; topped by the heat pump.
Red Bay, AL - 5 February 2013
Service Bay 40 - closer look at one of the old legs .
Red Bay, AL - 5 Feb 2013
Service Bay 40 - the amputated jack position is where the guy in the picture is standing.
Red Bay, AL - 5 Feb 2013
Service Bay 40 - and the Phaeton reaches new heights for Atwood Levelers replacement.
Red Bay, AL - 5 Feb 2013
Service Bay 45 - Sandy gets to work on removing the plywood flooring; note the grey metal strips used to strap up the black and grey water tanks to the frame.
Red Bay, AL - 5 February 2013
Service Bay 45 - placing wood blocks on either side so that the foam doesn't dam up water from any leaks, Sandy fills the openings with spray polyurethane foam.
Red Bay, AL - 5 February 2013
Service Bay 45 - the fresh water is slid back in; waiting for Sandy to re-connect the overflow piumbing and lower the black and grey tanks back in place.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor goes in.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor for the wet bay replaces the old plywood floor that was rotting out.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor for the wet bay replaces the old plywood floor that was rotting out.
Red Bay, AL - 5 February 2013
Service Bay 45 - the new composite floor for the wet bay replaces the old plywood floor that was rotting out.
Red Bay, AL - 5 February 2013
See photo in original gallery.